Wednesday, 4 February 2015

Scrum Implementation : Live project experience

So we completed a 3 – Sprint DWH project for a FMCG US based company.
It was a roller coaster ride and we stretched every bit of our mental and physical skin to deliver.

Technical Streams: The project had the following technical streams

1.       Data Modeling – The data modelers started off with their part of analysis and prepared the logical data models of the Salesforce ERP source system.
a.       The analogous tables were physicalised in the Oracle relational dbse which was called as the first layer. The business key was being used as the primary key in this layer.
b.      The second layer was the staging layer where the dimensional model existed(ODS). Facts and dimensions were identified by the onsite teams and the same were incorporated in the logical data model and implemented in the physical data model in the 2nd layer of the DWH.Here the Surrogate key was the primary key called as the SID or the source identifier.
c.       The presentation layer (BIDW)was the third and the final layer which had the warehouse identifier (WID) as the primary key , it also had the SID.The tables were a mirror image of their siblings in the ODS table.

2.       ETL – Informatica 9.6 on Linux was being used for this project.

3.       Reporting – Cognos 10.1 clients were used.